There are also a range of different ways that it can be applied to the roof.
Pitched roof felt instructions.
Roofing felt is both durable and able to deal with the worse of the weather such as wind and rain.
Stick on the underlayment.
After this lines should be snapped every 34 as you move up the roof.
Insert staples with a hammer stapler 12 inches apart along the top and bottom edges of the felt paper as you roll it out along the roof.
It not only protects the roof but it also protects the fascia.
Before laying roof felt all rotten decking must be replaced.
Project step by step 15 roll out the self stick underlayment.
Drip edges on the eaves any valley liners and all flashing should be installed before the tar paper is laid.
Install peel and stick roofing in a similar manner.
Once you ve done this you re done.
You can use your utility knife to cut a slit in the felt overhang at the very top of the roof and then fold the felt down there and nail securely at regular intervals along the gable.
Install roll roofing when the temperature is at least 50 degrees fahrenheit to keep the material from cracking.
Hi guys and welcome to my video.
It can also be applied to both flat roofs and also pitched and curved roofs meaning there are many jobs where it is the perfect roofing material.
How to install felt underlayment for a new roof.
You can then hide the folded over roofing felt with the use of fascia boards.
15 asphalt saturated felt starting at the eaves and lapping upper courses over lower.
Protect the roof against ice dams and windblown rain with self stick ice and water.
Installing a roof is much more than just nailing shingles onto some boards.
Run the felt 6 inches over ridges and hips from each direction and 6 inches up any adjoining walls.
Drip edge or drip cap is either plastic or sheet metal.
It starts with installing solid decking usually plywood or oriented.
Peel off the bottom backing.
Adjust the bottom of the felt if necessary to keep it flush with the gutter apron.
Step 4 continue rolling out the felt until you reach the roof hip on the other end.
The initial layer of felt should be installed to cover the bottom edge of the decking from edge to edge.
Overhang is not required.
Chalk lines should be snapped 33 5 8 above the eave line.
Then pull off the.
I had to re felt my shed roof so i though i d share with you the process i went through and the materials i used.