During finishing the floor is leveled and smoothed with a surface that you can walk across on your bare feet.
Rough basement floor.
Check the smoothness of your concrete basement floor.
Wipe away the remaining dust with a damp cloth.
It does require floor prep to smooth the floor otherwise the surface of the sub floor will telegraph through within 6 months.
Most compounds require that you first coat the floor with a primer.
Step 3 clean the concrete basement floor.
After the primer has cured mix the compound and spread it onto the floor up to 1 2 inch thick with a floor squeegee.
Also usually sheet vinyl comes in 12 foot rolls and if your basement is wider than 12 ft you ll need to have a seam and buy extra vinyl to cover the area and make sure you order enough extra so that the can.
Fortunately you don t have to deal with dips.
Use sandpaper to even the patches of rough concrete.
With years of use though a concrete floor will wear down with the once smooth surface becoming roughened or damaged.
Installing a tile floor in all or part of your basement lets you have some fun with design while still quickly covering up existing concrete floors.
Self leveling concrete is a liquid mortar that you pour and spread onto a sloped rough uneven but structurally sound floor.
Concrete floors are common fixtures inside of the garage but with modern home designs becoming more and more appealing they re slowly make their way inside.
A well finished concrete floor should be comfortable to use as well as strong and durable.